Corporate Group
CEYKAR ELECTRICITY PRODUCTION CO. INC

CEYKAR was established in 2000. It is active in Energy Generation Business. It works according to Law 4628 (Electricity Market Law in Turkey) in order to build and operate Hydroelectric Power Plants.

Ceykar's first Project which is Bagisli Regulator and HEPP was successfully completed in 2009 and has entered into operation. Its installed capacity is 30MW with an annual generation capacity of 1OO.OOO.OOOkWh.

Ceykar's middle-term energy generation target is 1 billion kWh.

Ceykar's New Investment Projects are;

  • Kaya Dam and HEPP
  • Sabolu Regulator and HEPP I
  • Sabolu Regulator and HEPP II

SABOLU REGULATOR AND HYDROELECTRIC POWER PLANT

POWER PLANT 1

The project is located on Sehribani river, southeast part
of Cide town, Kastamonu-Turkey between 345m and 250
m elevation.

Project Characteristics:

Installed Capacity : 9,12 MW
Annual Generation Capacity : 29.840.000 kWh
Type of Turbine : Vertical Axis Francis
Design Discharge : 12,00 m3/sec
Net Head : 85,83 m
Annual Mean Discharge (at weir) : 6,77 m3/sec
Design Flood Discharge Q{100) : 317,10 m3/sec
Type of Weir : Concrete Fill
Elevation of Thalweg : 339,50 m
Elevation of Crest : 340,50 m
Length of Closed Conduit : 7779,60 m
Length of Conveyance Tunnel : 1665,0 m
Diameter of Conveyance Tunnel : 3,00 m
Length of Penstock : 1,80 m
Penstock Diameter : 208,81 m

POWER PLANT 2

The project is located on Sehribani river, southeast part
of Cide town, Kastamonu-Turkey between 250m and 50 m elevation.

Project Characteristics:

Installed Capacity : 25,05 MW
Annual Generation Capacity : 81.210.000 kWh
Type of Turbine : Vertical Axis Francis
Design Discharge : 15,00 m3/sec
Net Head : 188,57 m
Design Flood Discharge Q{100) : 417,20 m3/sec
Type of Weir : Concrete Fill
Elevation of Thalweg : 244,50 m
Elevation of Crest : 245,50 m
Length of Conveyance Tunnel : 7780,0 m
Diameter of Conveyance Tunnel : 3,10 m
Length of Penstock : 334,0 m
Penstock Diameter : 1,90 m

BAGISLI REGULATOR AND HYDROELECTRIC POWER PLANT

The project is located on Zap river, Hakkari-Turkey. It was successfully complated and has entered into
operation in 2009.

Project Characteristics:

Installed Capacity : 30,09 MW
Annual Generation Capacity : 99.000.000 kWh
Type of Turbine : Vertical Axis Francis
Design Discharge : 31,24 m3/sec
Net Head : 102,5 m
Design Flood Discharge Q{100) : 426,6 m3/sec
Type of Weir : Concrete Fill
Elevation of Thalweg : 1.691,50 m
Elevation of Crest : 1.697,50 m
Length of Closed Conduit : 259 m
Length of Conveyance Tunnel : 2714 m
Diameter of Conveyance Tunnel : 4,0 m
Length of Penstock : 255,0 m
Penstock Diameter : 2,2 m

KAYA DAM AND HYDROELECTRIC POWER PLANT

The project is located on Zabrana stream, in inebolu town, Kastamonu-Turkey between 253m and 37 m elevation.

Project Characteristics:

Installed Capacity : 28,84 MW
Annual Generation Capacity : 85.250.000 kWh
Type of Turbine : Vertical Axis Francis
Design Discharge : 12,00 m3/sec
Net Head : 280,26 m
Annual Mean Discharge (at weir) : 4,60 m3/sec
Design Flood Discharge Q{100) : 506,40 m3/sec
Type of Weir : Concrete Fill
Elevation of Thalweg : 253,00 m
Elevation of Crest : 345,00 m
Length of Closed Conduit : 4000,0 m
Length of Conveyance Tunnel : 1665,0 m
Diameter of Conveyance Tunnel : 4,00 m
Length of Penstock : 2,10 m
Penstock Diameter : 1330,00 m